Orange Grove Boulevard Resurfacing,

On-call Project Management

Under our On-call Project Management contract, APP is provided engineering design services for the resurfacing of Orange Grove Boulevard from Lincoln Avenue to Lake Avenue (Segment 1, 1.3 miles), Wilson Avenue to Altadena Drive (Segment 2A, 1.7 miles), and Altadena Drive to Sierra Madre Villa Avenue (Segment 2B, 1.0 miles).  The resurfacing method is CIR with an ARHM overlay for Segment 1 and a mill and fill for Segments 2A and 2B. Additionally, for Segment 2A, the existing curb will be replaced with curb and gutter.

Back to Engineering Services

Client

City of Pasadena

Location

Pasadena, CA